September 15, 2023

West Gate Tunnel Project – Bolte Bridge HPFV Detour

Bolte Bridge HV Detour Routes

In a significant “win” for CTAA and the container transport logistics operators in Melbourne, Transurban has published conditions for Higher Productivity Freight Vehicles (HPFVs) operating above 68.5t Gross Vehicle Mass (GVM) to access the Bolte Bridge while Wurundjeri Way is closed from 2 October as part of the West Gate Tunnel Project (WGTP) construction works.


Read More

Share this article